About 5 months from order to keys.Your home is built in our factory while your site is prepared,so both are ready at once.

The Two Bedroom in a planted garden

Seven steps.

01

Configure

Choose your model, interior, cladding colour and fit-out, online or with the team.

02

Site check

Share your site details. We check the fit, the access and anything specific to your block.

03

Proposal

Your home, drawn for your site. Confirm it and we lock in your build slot.

Order confirmed

At the same time. Your site is prepared while your home is built.

04
Your home

Build

Built and fitted out in our factory, out of the rain, checked at every stage.

Inside the build shed: a forklift and a builder in a hard hat
05
Your site

Site preparation

At the same time, your site is prepared for its foundation.

Ready for delivery
06

Delivery

Lifted onto its foundation and installed. Crane access depends on your site.

07

Handover

Final inspections, a walk-through, then the keys in your hand.

A finished Bonsai home in late afternoon light, the garden planted
You get your keys

Start with a conversation. Then stand in one.

We guide you step by step, through to handover.