How it works.
About 5 months from order to keys.Your home is built in our factory while your site is prepared,so both are ready at once.

Seven steps.
Configure
Choose your model, interior, cladding colour and fit-out, online or with the team.
Site check
Share your site details. We check the fit, the access and anything specific to your block.
Proposal
Your home, drawn for your site. Confirm it and we lock in your build slot.
At the same time. Your site is prepared while your home is built.
Build
Built and fitted out in our factory, out of the rain, checked at every stage.

Site preparation
At the same time, your site is prepared for its foundation.
Delivery
Lifted onto its foundation and installed. Crane access depends on your site.
Handover
Final inspections, a walk-through, then the keys in your hand.

Start with a conversation. Then stand in one.
We guide you step by step, through to handover.